HERITAGE BROOK RESTORATION
Summerside, PEI
Date 2009
Client City of Summerside
The Heritage creek corridor was badly degraded including ditching and sections put into storm pipes. The restoration included developing a pond/storm water holding area which is also a recreation feature in the park and day lighting the stream that was in the storm pipes. The corridor was revegetated with native grass and trees.